Project Profile #2

Project Details

2011
Reclaimed 14” of old bituminous and aggregate material.
Stabilized top 4” with BASE ONE®.
2012
Added 1” new aggregate material for shaping.
Added 4.5” new bituminous surface.
Design tonnage = 9.

Project Test Results