Project Profile #5

  • Location County
  • Project Type
  • Application Method Blade Mix
  • Installation Date 2014

Project Details

County used 4″ salvaged aggregate, then added new Class 5 modified aggregate and stabilized with BASE ONE®. (200# sieve was modified to 5.5%-10% passing).

Notes: County had FWD testing done on 2 roads to check the strength. County #13 was only spot-treated with BASE ONE®. County #14 was treated the whole 4 miles.

Project Test Results