Project Profile #6

  • Location County
  • Project Type
  • Application Method Blade Mix
  • Installation Date 2017 - County tiled road 2018 - County brought in Class 5 Material

Project Details

County does several miles of tiling per year. The following year they stabilized the material with BASE ONE®.

The county blade mix the 2″ of Class 5 and 2″ recycled millings together and then stabilized the 4″ of mixed material with BASE ONE®. With the new BASE ONE® stabilized mixed material the county is able to save on material loss and also reduce the amount of annual blading.