Project Profile #1

Project Details

Fall 2014 – Reclaimed 8” material
Summer 2015 – Reclaimed and injected BASE ONE® into the 8”
Summer 2015 – Added 3” aggregate material
2015 – Added 5.5” bituminous
By stabilizing 8″ SFDR and the 3″ additional Class 5 with BASE ONE®, the county was able to reduce the pavement thickness, a savings of $580,000.00 on the 10 mile project.

Project Test Results

 

American Engineering Testing, Inc. tested the reclaimed material before BASE ONE® was added and after BASE ONE® was added.  Click the chart below for the results: